Image pending

Composition C-4 (M112 Demolition Block)

Explosives & Demolition · Plastic / Composition

Premier military plastic explosive of the United States Armed Forces and NATO allies (Composition C-4), valued for its high detonation velocity, moldable putty-like consistency across extreme temperatures, and exceptional physical stability against shock, impact, and small-arms fire.

Designation
—
Standard
United States (Composition C-4 / M112 Demolition Charge)
Origin
United States
Introduced
1956

Dates: 1956 (Standardized by U.S. military) – Present

In service

Community

Loading…

Technical overview

Premier military plastic explosive of the United States Armed Forces and NATO allies (Composition C-4), valued for its high detonation velocity, moldable putty-like consistency across extreme temperatures, and exceptional physical stability against shock, impact, and small-arms fire.

Technical specifications

Chemical Composition
RDX-based military plastic explosive (with polymeric binder and plasticizer)
Detonation Velocity (m/s)
8,092 m/s
Relative Effectiveness (vs TNT)
1.34
Density (g/cm³)
~1.59–1.60 g/cm³
Form Factor
Moldable putty-like block (standard M112 block: 570 g / 1.25 lb; 51 × 38 × 280 mm)
Primary Military Role
Combat engineering demolition, structural breaching, obstacle clearance, and munition filler

Military variants & loadings

DesignationTypeNotes
M112 Demolition Block—(standard 1.25 lb olive-drab wrapped C-4 charge)
M183 Demolition Charge Assembly—(20 lb satchel charge containing 16 M112 blocks)

Platforms & context

No linked weapons yet.

Dataset evidence note: Owner-supplied source assessment; not independently audited. Values remain qualified where supplied; unsourced or operational details are omitted.

Doctrine & history

Developed in the mid-1950s as an improved, wider-temperature-range successor to World War II Composition C-2 and C-3, C-4 is issued primarily in olive-drab 0.57 kg (1.25 lb) M112 rectangular demolition blocks and serves as the main explosive filler inside the M18A1 Claymore mine and M58 MICLIC breaching line charge.

Data trust

Reliability
Partially verified
Sources
Last reviewed
Sources and methodology

Technical and historical reference data only; no fabrication, handling, or operational instructions

ARSENALIS // Research desk

Dossier resources

0 operator entries

No operator entries recorded for this selection.

No structured operator list recorded. Country of origin is not treated as an operator.

Community

Loading…

Recent reviews

    Sources & image credits →