CruiserSoviet Union / Russia1952Decommissioned

The Sverdlov -class cruisers, Soviet designation Project 68bis, were the last conventional gun cruisers built for the Soviet Navy. They were built in the 1950s and were based on Soviet, German, and Italian designs and concepts developed before the Second World War.

Data-only class record added 21 November 2026 (Batch 12 raw-data expansion). One page per class; individual ships appear only in Ships & variants. Illustration pending. Text adapted from Wikipedia (CC BY-SA 4.0).

Cruiser // ID — sverdlov-class
Soviet Union / Russia · Baltic Shipyard, Leningrad; Nikolayev Shipyard, Mykolaiv; Admiralty Shipyard, Leningrad; Severodvinsk Shipyard, Severodvinsk
Image pending

Community

Loading…

Identity6 fields

Designation
Sverdlov class
Country
Soviet Union / Russia
Category
Cruiser
Role
Cruiser

Production & service5 fields

Introduced
1952
Service entry
1952–1992
Status
Decommissioned
Units produced
Built: 1948–1959 / Completed: 14 / Planned: 30 / Retired: 13 / Preserved: 1; Mikhail Kutuzov
Operators
Soviet Navy; Russian Navy; Indonesian Navy

Specifications10 fields

Full-load displacement
13,600 t
Crew
1,250
Length
210 m
Beam
22 m
Draught
6.9 m

Data trust

Reliability
Partially verified
Sources
Last reviewed
Confidence level
Partial. Class figures transcribed from the cited Wikipedia article (infobox and ship list) on 21 November 2026; not independently audited.
Sources and methodology

Historical profile

They were modified to improve their sea capabilities, allowing them to operate at high speeds in the rough waters of the North Atlantic. The design carried an extensive suite of modern radar equipment and anti-aircraft artillery, which made an approach by existing aircraft within 5,000 yards (4,600 m) extremely dangerous. The Sverdlov design was part of a post- WWII fleet concept that also included the Stalingrad -class battlecruisers and aircraft carriers that would transform the Soviet Navy into one able to field a first-class fleet for deep water operations. The entire concept was considered obsolete by anyone outside the Soviet Navy, but it retained the support of Joseph Stalin and construction program continued to move forward. The Sverdlov was launched in July 1950, by which time a large number of sister ships were under construction, followed by the Stalingrad s construction beginning in November 1951. The introduction of the Sverdlov s was cause for great concern in the Royal Navy.

Ships & variants

Hulls listed: 21 · In service: 0 · On order: 0

NamePennantOperatorBuilderLaid downLaunchedCommissioned / deliveredStatusBatch / variant
Sverdlov——Baltic Shipyard, Leningrad15 October 19495 July 1950—DecommissionedStricken 1989—
Zhdanov——Baltic Shipyard, Leningrad11 February 195027 December 1950—DecommissionedStricken 1991—
Admiral Ushakov——Baltic Shipyard, Leningrad31 August 195029 September 1951—DecommissionedStricken 1987—
Aleksandr Suvorov——Baltic Shipyard, Leningrad26 February 195115 May 1952—DecommissionedStricken 1990—
Admiral Senyavin——Baltic Shipyard, Leningrad31 October 195122 December 1952—DecommissionedStricken 1991—
Dmitry Pozharsky——Baltic Shipyard, Leningrad31 March 195225 June 1953——To reserve 1979.—
Kronstadt——Baltic Shipyard, LeningradOctober 195311 September 1954—DecommissionedBroken up, 1961—
Tallinn——Baltic Shipyard, Leningrad195311 September 1954—DecommissionedBroken up, 1961—
Varyag——Baltic Shipyard, LeningradDecember 19525 June 1956—DecommissionedBroken up, 1961—
Ordzhonikidze——Admiralty Shipyard, Leningrad19 October 194917 September 1950—DecommissionedBroken up, 1972—
Aleksandr Nevsky——Admiralty Shipyard, Leningrad30 May 19507 June 1951—DecommissionedStricken 1989—
Admiral Lazarev——Admiralty Shipyard, Leningrad6 February 195129 June 1952—DecommissionedDecommissioned 1986—
Shcherbakov——Admiralty Shipyard, LeningradJune 195117 March 1954—DecommissionedBroken up, 1961—
Dzerzhinsky——Nikolayev31 December 194831 August 1950—DecommissionedStricken 1989—
Admiral Nakhimov——Nikolayev27 June 195029 June 1951—DecommissionedStricken 1961—
Mikhail Kutuzov——Nikolayev23 February 195129 November 1952—DecommissionedMuseum ship—
Admiral Kornilov——Nikolayev6 November 195117 March 1954——Hulk PKZ 130, 1957—
Oktyabrskaya Revolyutsia (ex- Molotovsk)——Severodvinsk15 July 195225 May 1954—DecommissionedStricken 1987—
Murmansk——Severodvinsk28 January 195324 April 1955—DecommissionedStricken 1992—
Arkhangelsk——Severodvinsk1954— N/a—DecommissionedBroken up, 1961—
Vladivostok——Severodvinsk1955— N/a—DecommissionedBroken up, 1961—

Programme / unit cost: —

← Back to naval systems

ARSENALIS // Research desk

Dossier resources

0 operator entries

No operator entries recorded for this selection.

No structured operator list recorded. Country of origin is not treated as an operator.

Community

Loading…

Recent reviews

    Sources & image credits →