Challenger 3
Country: United KingdomManufacturer: Rheinmetall BAE Systems Land (RBSL)
Next-generation main battle tank of the British Army being built by RBSL at Telford, replacing Challenger 2's rifled cannon with a NATO-standard Rheinmetall 120 mm L55A1 smoothbore gun inside a completely redesigned digital turret fitted with Epsom/Farnham modular armor and Trophy active protection.
Service dates: 2021 (Contract awarded) – 2024 (Pre-production prototypes unveiled) – Present
Supplied specifications (Batch 5, 18 Nov 2026): Crew: 4 (commander, gunner, loader, driver); Combat Weight: ~66 tonnes; Main Armament: 120 mm Rheinmetall L55A1 smoothbore gun + 7.62 mm L94A1 coaxial chain gun + 7.62 mm L37A2; Engine / Speed: Perkins CV12-9A 1,200 hp V12 diesel (with upgraded Hydrogas suspension); ~60 km/h road speed
Data trust — Partial: RBSL manufacture, May 2021 contract for 148 tanks, Rheinmetall 120 mm L55A1 smoothbore gun, Trophy APS integration, and 2024 prototype trials: Verified against cited official UK Ministry of Defence and manufacturer sources. Exact serial delivery count: Unverified (—).
Illustration: Based on reference: https://upload.wikimedia.org/wikipedia/commons/7/77/Challenger_3_ATD.jpg
Community
Identity4 fields
- Designation
- Challenger 3
- Manufacturer
- Rheinmetall BAE Systems Land (RBSL)
- Country
- United Kingdom
- Category
- Main battle tank
Production & service3 fields
- Introduced
- 2021
- Status
- In development
- Units produced
- —
Specifications11 fields
- Combat weight
- 66 t
- Crew
- 4
- Main armament
- 120 mm Rheinmetall L55A1 smoothbore gun + 7.62 mm L94A1 coaxial chain gun + 7.62 mm L37A2
- Secondary armament
- —
- Engine
- Perkins CV12-9A 1,200 hp V12 diesel (with upgraded Hydrogas suspension)
Data trust
- Reliability
- Partially verified
- Sources
- Combat Vehicles — Challenger 3British Army · Accessed
- Challenger 3Rheinmetall BAE Systems Land · Accessed
- Last reviewed
Historical profile
Ordered in May 2021 under an £800+ million program to upgrade 148 Challenger 2 hulls into Challenger 3 tanks—with the first pre-production prototype completing live-fire trials in Germany in 2024—the Challenger 3 is scheduled to reach Initial Operating Capability with the Royal Armoured Corps in 2027.



