R-21
4K55 / SS-N-5 Serb
Country: Soviet UnionManufacturers: SKB-385 (Viktor Makeyev Design Bureau), Krasmash (co-manufacturer)
SLBMHistoric
First Soviet submarine-launched ballistic missile capable of being fired from a submerged submarine (R-21 / 4K55), more than doubling the range of the R-13 to 1,400 km and retrofitted into modernized Project 629A (Golf II) and Project 658M (Hotel II) submarines.
Submarine-launched ballistic missile
AI-generated illustration based on a photo by Johnny Rotten, Public domain, via Wikimedia Commons.
Community
Loading…
Identity5 fields
- Country
- Soviet Union
- Manufacturer
- SKB-385 (Viktor Makeyev Design Bureau) / Krasmash
- Introduction
- 1963
- Status
- Historic
- Category
- Submarine-launched ballistic missile
Specifications4 fields
- Launch platform
- Submarine
- Range
- —
- Length
- —
- Launch weight
- —
- Diameter
- —
Supplied specifications
- Dates: 1963 (In service) – 1989 (Retired from service)
- Propulsion: Single-stage storable liquid-propellant rocket (UDMH / AK-27I nitric acid — S5.3 engine)
- Launch Mass: ~19.6 tonnes
- Length / Diameter: ~14.2 m / ~1.3 m
- Operational Range: ~1,400–1,650 km
- Payload / Warheads: Single 0.8–1.0 megaton thermonuclear warhead
- Data trust: Partial. SKB-385 Makeyev design, 1963–1989 service dates, first Soviet submerged-launch SLBM milestone, ~19.6-tonne launch mass, and ~1,400–1,650 km range: Verified against cited historical sources. Exact CEP: Unverified (—).
Variants
- R-21 (4K55 / SS-N-5 Serb) (submerged-launched Golf II and Hotel II-class SLBM)
Data trust
- Reliability
- Partially verified
- Sources
- R-21 (missile)Wikipedia · Accessed
- Last reviewed
History and evolution
Achieving the Soviet Navy's first successful submerged ballistic missile launch in September 1960 and entering operational service in May 1963, the R-21 utilized flooded launch tubes and a pressurized combustion chamber to ignite underwater before clearing the surface.
Community
Loading…



