AuxiliaryUnited States2013In service

An Expeditionary Transfer Dock (ESD), formerly the Mobile Landing Platform (MLP), is designed to be a semi- submersible, flexible, modular platform providing the US Navy with the capability to perform large-scale logistics movements such as the transfer of vehicles and equipment from sea to shore. These ships significantly reduce the dependency on foreign ports and provide support in the absence of port availability.

Data-only class record added 21 November 2026 (Batch 12 raw-data expansion). One page per class; individual ships appear only in Ships & variants. Illustration pending. Text adapted from Wikipedia (CC BY-SA 4.0).

Auxiliary // ID — montford-point-class
United States · General Dynamics National Steel and Shipbuilding Company (NASSCO)
Image pending

Community

Loading…

Identity5 fields

Designation
Montford Point class
Country
United States
Category
Auxiliary
Figures refer to
—

Production & service5 fields

Introduced
2013
Service entry
2013-present
Status
In service
Units produced
Built: 2012-present / Completed: 8 / Planned: 8 / Active: 6
Operators
United States Navy

Specifications10 fields

Full-load displacement
—
Crew
—
Length
239 m
Beam
50 m
Draught
12 m

Data trust

Reliability
Partially verified
Sources
Last reviewed
Confidence level
Partial. Class figures transcribed from the cited Wikipedia article (infobox and ship list) on 21 November 2026; not independently audited.
Sources and methodology

Historical profile

The class also houses a sub-class variant called the Expeditionary Mobile Base (ESB), formerly the Afloat Forward Staging Base (AFSB). The ESD and ESB are part of a new ship class added in 2015 with an E as a new designator, similar to the L-class amphibious ships, S-class submarines, A-class auxiliaries and more. These three E-class ships were previously listed as seabasing ships in the Naval Vessel Register. In May 2011, General Dynamics NASSCO received a $744 million contract modification to fully fund the construction of the first two ships of the class, USNS Montford Point (ESD-1) and USNS John Glenn (ESD-2). Additional funding of $115 million for long lead time material and advanced design was awarded in August 2011. The first ship of the ESD program, USNS Montford Point (ESD-1) was delivered in May 2013, and the second ship, USNS John Glenn (ESD-2), was delivered March 12, 2014.

← Back to naval systems

ARSENALIS // Research desk

Dossier resources

0 operator entries

No operator entries recorded for this selection.

No structured operator list recorded. Country of origin is not treated as an operator.

Community

Loading…

Recent reviews

    Sources & image credits →