Kormoran 2 class
Country: PolandManufacturer: Remontowa Shipbuilding SA
The Kormoran II (Cormorant class), formally Project 258, is a class of mine hunting vessels of the Polish Navy. Three ships of the class were ordered in 2013.
Data-only class record added 21 November 2026 (Batch 12 raw-data expansion). One page per class; individual ships appear only in Ships & variants. Illustration pending. Text adapted from Wikipedia (CC BY-SA 4.0).

Community
Identity6 fields
- Designation
- Kormoran 2 class
- Manufacturer
- Remontowa Shipbuilding SA
- Country
- Poland
- Category
- Minehunter
- Role
- Minehunter
Production & service4 fields
- Introduced
- —
- Status
- In service
- Units produced
- Completed: 3 / Planned: 6 / Active: 3 / Building: 3
- Operators
- Marynarka Wojenna
Specifications10 fields
- Full-load displacement
- 850 t
- Crew
- 44
- Length
- 58.5 m
- Beam
- 10.3 m
- Draught
- 2.7 m
Data trust
- Reliability
- Partially verified
- Sources
- Kormoran 2-class minehunterWikipedia · Accessed
- Last reviewed
- Confidence level
- Partial. Class figures transcribed from the cited Wikipedia article (infobox and ship list) on 21 November 2026; not independently audited.
Historical profile
The first unit was launched on 4 September 2015 and entered service in 2017. Three more ships have been ordered in 2022. Ships are built by Remontowa Shipbuilding Gdańsk and Naval Shipyard Gdynia consortium. It's armed with a 35mm OSU-35K naval weapon station.
Ships & variants
Hulls listed: 6 · In service: 3 · On order: 0
| Name | Pennant | Operator | Builder | Laid down | Launched | Commissioned / delivered | Status | Batch / variant |
|---|---|---|---|---|---|---|---|---|
| ORP Kormoran (601) | — | — | — | 23 September 2014 | 4 September 2015 | 28 November 2017 | In serviceActive | — |
| ORP Albatros (602) | — | — | — | 18 September 2018 | 19 October 2019 | 28 November 2022 | In serviceActive | — |
| ORP Mewa (603) | — | — | — | 10 October 2019 | 17 December 2020 | 14 February 2023 | In serviceActive | — |
| ORP Jaskółka (604) | — | — | — | 25 July 2023 | 26 June 2024 | — | —Launched | — |
| ORP Rybitwa (605) | — | — | — | 20 March 2024 | 19 March 2025 | — | —Launched | — |
| ORP Czajka (606) | — | — | — | 15 October 2024 | 11 December 2025 | — | —Launched | — |
Programme / unit cost: —
Variants
Related systems
ARSENALIS // Research desk
Dossier resources
Loading map…
Natural Earth · schematic bordersNo operator entries recorded for this selection.
No structured operator list recorded. Country of origin is not treated as an operator.



