Kedah class
Country: MalaysiaManufacturers: Blohm + Voss, HDW, German Naval Group (GNG); Boustead Heavy Industries Corporation (Formerly PSC-Naval Dockyard) (co-manufacturer)
The Kedah -class offshore patrol vessels of the Royal Malaysian Navy (RMN) are six ships based on the MEKO 100 design by Blohm + Voss. Originally, a total of 27 ships were planned, but due to programme delays and overruns, only six were eventually ordered.
Data-only class record added 21 November 2026 (Batch 12 raw-data expansion). One page per class; individual ships appear only in Ships & variants. Illustration pending. Text adapted from Wikipedia (CC BY-SA 4.0).

Community
Identity6 fields
- Designation
- Kedah class
- Manufacturer
- Blohm + Voss, HDW, German Naval Group (GNG); Boustead Heavy Industries Corporation (Formerly PSC-Naval Dockyard) (co-manufacturer)
- Country
- Malaysia
- Category
- Offshore patrol vessel
- Role
- MEKO 100 RMN offshore patrol vessel
Production & service4 fields
- Introduced
- —
- Status
- In service
- Units produced
- Completed: 6 / Planned: 27 / Active: 6
- Operators
- Royal Malaysian Navy
Specifications11 fields
- Full-load displacement
- 1,850 t
- Crew
- 78
- Length
- 91.1 m
- Beam
- 12.85 m
- Draught
- 3.4 m
Data trust
- Reliability
- Partially verified
- Sources
- Kedah-class offshore patrol vesselWikipedia · Accessed
- Last reviewed
- Confidence level
- Partial. Class figures transcribed from the cited Wikipedia article (infobox and ship list) on 21 November 2026; not independently audited.
Historical profile
Their construction began in the early 2000s, and by 2009, all six were in active service. The six vessels are named after Malaysian states.
Ships & variants
Hulls listed: 6 · In service: 0 · On order: 0
| Name | Pennant | Operator | Builder | Laid down | Launched | Commissioned / delivered | Status | Batch / variant |
|---|---|---|---|---|---|---|---|---|
| KD Kedah | F171 | — | Blohm + Voss | 13 November 2001 | 21 March 2003 | 5 June 2006 | — | — |
| KD Pahang | F172 | — | HDW | 21 December 2001 | 2 October 2003 | 3 August 2006 | — | — |
| KD Perak | F173 | — | Boustead Heavy Industries Corporation (BHIC) | March 2002 | 12 November 2007 | 3 June 2009 | — | — |
| KD Terengganu | F174 | — | Boustead Heavy Industries Corporation (BHIC) | August 2004 | 6 December 2007 | 8 December 2009 | — | — |
| KD Kelantan | F175 | — | Boustead Heavy Industries Corporation (BHIC) | July 2005 | 24 November 2008 | 8 May 2010 | — | — |
| KD Selangor | F176 | — | Boustead Heavy Industries Corporation (BHIC) | July 2006 | 23 July 2009 | 28 December 2010 | — | — |
Programme / unit cost: —
Variants
Related systems
ARSENALIS // Research desk
Dossier resources
Loading map…
Natural Earth · schematic bordersNo operator entries recorded for this selection.
No structured operator list recorded. Country of origin is not treated as an operator.



