Karakurt class
The Karakurt class, Russian designation Project 22800 Karakurt (Russian: Каракурт, lit. ' Mediterranean black widow spider (Latrodectus tredecimguttatus) '), is a class of Russian Navy corvettes (small missile ships) first commissioned in 2018. The class is intended as a more seaworthy, blue-water complement to the Buyan-M-class corvettes, designed for the littoral zone and which as of 2015 serve in Russia's Caspian Flotilla, Baltic Fleet and Black Sea Fleet.
Data-only class record added 21 November 2026 (Batch 12 raw-data expansion). One page per class; individual ships appear only in Ships & variants. Illustration pending. Text adapted from Wikipedia (CC BY-SA 4.0).
Illustration: Karakurt class, reference configuration, photo-derived illustration
Community
Identity6 fields
- Designation
- Karakurt class
- Country
- Russia
- Category
- Corvette
- Role
- Guided-missile corvette
Production & service5 fields
- Introduced
- 2018
- Service entry
- 2018–present
- Status
- In service
- Units produced
- Built: 2015–present / Completed: 13 / Planned: 16 / Active: 7 (+3 likely on trials, one - Askold - heavily damaged, undergoing repairs) / Building: 2 / Lost: 1 (Tsiklon)
- Operators
- Russian Navy
Specifications11 fields
- Full-load displacement
- 800 t
- Crew
- 50
- Length
- 67 m
- Beam
- 11 m
- Draught
- 3.3 m
Data trust
- Reliability
- Partially verified
- Sources
- Karakurt-class corvetteWikipedia · Accessed
- Last reviewed
- Confidence level
- Partial. Class figures transcribed from the cited Wikipedia article (infobox and ship list) on 21 November 2026; not independently audited.
Historical profile
The ships are designed to be armed with Kalibr or Oniks anti-ship cruise missiles and have an endurance of 15 days. They are also to be a cheap alternative for larger Admiral Grigorovich -class frigates, for which construction was delayed due to the suspended military cooperation with Ukraine, and because of Russia's intention to continue the modernization of its navy until all necessary tasks for construction of larger vessels domestically are solved. Delays in the supply of domestically-produced engines for the Karakurt class have held up the completion of several ships.
Ships & variants
Hulls listed: 16 · In service: 5 · On order: 0
| Name | Pennant | Operator | Builder | Laid down | Launched | Commissioned / delivered | Status | Batch / variant |
|---|---|---|---|---|---|---|---|---|
| Mytishchi (ex- Uragan) | — | — | Pella Shipyard | 24 December 2015 | 29 July 2017 | 17 December 2018 | In serviceActive | — |
| Sovetsk (ex- Taifun) | — | — | Pella Shipyard | 24 December 2015 | 24 November 2017 | 12 October 2019 | In serviceActive | — |
| Kozelsk (ex- Shtorm) | — | — | More Shipyard | 10 May 2016 | 9 October 2019 | 2026? | —Reported on "tests" as of 2024 | — |
| Tsiklon | — | — | Zaliv Shipbuilding yard | 26 July 2016 | 24 July 2020 | 12 July 2023 | —Likely destroyed in May 2024; Russian sources confirmed the ship's destruction. | — |
| Odintsovo (ex- Shkval) | — | — | Pella Shipyard | 29 July 2016 | 5 May 2018 | 21 November 2020 | In serviceActive | — |
| Askold (ex- Musson) | — | — | Zaliv Shipbuilding yard | 18 November 2016 | 21 September 2021 | — | —Damaged by missile strike on 4 November 2023; reports suggest that repairs were being attempted as of late 2023 | — |
| Burya | — | — | Pella Shipyard | 24 December 2016 | 23 October 2018 | 8 May 2026 | In serviceActive | — |
| Okhotsk | — | — | More Shipyard | 17 March 2017 | 29 October 2019 | 2028 | —Launched | — |
| Amur (ex- Passat) | — | — | Zaliv Shipbuilding yard | 30 July 2017 | 26 December 2022 | 26 August 2024 | In serviceActive | — |
| Vikhr | — | — | More Shipyard | 19 December 2017 | 13 November 2019 | 2030 | —Launched | — |
| Tucha | — | — | Zelenodolsk Shipyard | 26 February 2019 | 30 June 2023 | 21 December 2024 | —Reported deployed from the Black Sea Fleet and operating in the Caspian as of April 2025 | — |
| Rzhev | — | — | Amur Shipyard | 1 July 2019 | 27 September 2023 | 2026 | In trialsOn sea trials as of 2025 | — |
| Udomlya | — | — | Amur Shipyard | 1 July 2019 | 27 September 2023 | 2026 | —Launched | — |
| Taifun | — | — | Zelenodolsk Shipyard | 11 September 2019 | 7 May 2024 | 28 August 2025 | —Reported deployed from the Black Sea Fleet and operating in the Caspian as of April 2025 | — |
| Shtorm | — | — | Amur Shipyard | 26 December 2019 | 1 July 2026 | — | Under constructionBoth under construction; names Ussuriysk & Pavlovsk have also been reported for these vessels | — |
| Uragan | — | — | Amur Shipyard | 29 July 2020 | — | — | Under constructionBoth under construction; names Ussuriysk & Pavlovsk have also been reported for these vessels | — |
Programme / unit cost: —
Variants
Related systems
ARSENALIS // Research desk
Dossier resources
Loading map…
Natural Earth · schematic bordersNo operator entries recorded for this selection.
No structured operator list recorded. Country of origin is not treated as an operator.



