Isaac Peral class (S-80 Plus)

Country: SpainManufacturer: Navantia, Cartagena

Conventional submarineSpain2023In service

Isaac Peral (S 81) is the only S-80 Plus boat in Spanish Navy service as of 18 November 2026. Narciso Monturiol (S 82) remains in trials, with delivery scheduled for 10 December 2026; S 83 and S 84 are under construction.

November 2026 status follows the owner-supplied light sanity check, not a full specification audit. Approximate figures retain their supplied configuration qualifiers. Unsourced values and costs remain —; trials, planned delivery and construction do not count as in service.

Supplied displacement figures are about 2,695 t surfaced / 2,965 t submerged, but later reporting differs for S 82. Displacement remains — rather than choosing a disputed class-wide figure.

Conventional submarine // Isaac Peral class (S-80 Plus)ID — isaac-peral-class
Spain · Navantia, Cartagena

AI render based on photo by Ismael Olea, CC BY 4.0. Based on reference: https://commons.wikimedia.org/wiki/File:PXL_20231229_-_Isaac_Peral_en_el_puerto_de_Cartagena.jpg

Community

Loading…

Identity5 fields

Designation
Isaac Peral class (S-80 Plus)
Country
Spain
Category
Conventional submarine
Figures refer to
Isaac Peral class (S-80 Plus)

Production & service3 fields

Introduced
2023
Status
In service
Units produced
4-boat programme; 1 in service

Specifications10 fields

Submerged displacement
—
Crew
About 32 + 8 embarked
Length
80.8 m
Beam
7.3 m
Draught
—

Data trust

Reliability
Partially verified
Sources
Last reviewed
Sources and methodology

Historical profile

BEST bio-ethanol AIP is planned from build for S 83 and S 84. S 81 and S 82 are planned to receive it at a later major overhaul; Isaac Peral is not described as currently AIP-equipped.

Ships & variants

Hulls listed: 4 · In service: 1 · On order: 0

NamePennantOperatorBuilderLaid downLaunchedCommissioned / deliveredStatusBatch / variant
Isaac PeralS 81SpainNavantia, Cartagena——30 November 2023 (delivery / commissioning ceremony at Cartagena)In serviceLead boat. AIP not yet fitted (planned at a later overhaul).
Narciso MonturiolS 82SpainNavantia, Cartagena—October 2025 (launch / putting afloat, as reported 16 November 2026)Delivery scheduled 10 December 2026; had not taken place as of 18 November 2026In trialsNot yet in service. AIP planned at a later overhaul.
Cosme GarcíaS 83SpainNavantia, Cartagena———Under constructionPlanned with AIP from build. Later delivery (reporting has mentioned around 2028).
Mateo García de los ReyesS 84SpainNavantia, Cartagena———Under constructionPlanned with AIP from build.

Programme / unit cost: —