Isaac Peral class (S-80 Plus)
Country: SpainManufacturer: Navantia, Cartagena
Isaac Peral (S 81) is the only S-80 Plus boat in Spanish Navy service as of 18 November 2026. Narciso Monturiol (S 82) remains in trials, with delivery scheduled for 10 December 2026; S 83 and S 84 are under construction.
November 2026 status follows the owner-supplied light sanity check, not a full specification audit. Approximate figures retain their supplied configuration qualifiers. Unsourced values and costs remain —; trials, planned delivery and construction do not count as in service.
Supplied displacement figures are about 2,695 t surfaced / 2,965 t submerged, but later reporting differs for S 82. Displacement remains — rather than choosing a disputed class-wide figure.
Community
Identity5 fields
- Designation
- Isaac Peral class (S-80 Plus)
- Manufacturer
- Navantia, Cartagena
- Country
- Spain
- Category
- Conventional submarine
- Figures refer to
- Isaac Peral class (S-80 Plus)
Production & service3 fields
- Introduced
- 2023
- Status
- In service
- Units produced
- 4-boat programme; 1 in service
Specifications10 fields
- Submerged displacement
- —
- Crew
- About 32 + 8 embarked
- Length
- 80.8 m
- Beam
- 7.3 m
- Draught
- —
Data trust
- Reliability
- Partially verified
- Sources
- Spanish Navy class and ship profiles cited in the supplied datasetArmada Española · Accessed
- S 81 Isaac Peral delivery — 30 November 2023Navantia · Accessed
- S 82 delivery scheduled for December — 16 November 2026El Español · Accessed
- S 82 scheduled delivery — 16 November 2026La Razón · Accessed
- Last reviewed
Historical profile
BEST bio-ethanol AIP is planned from build for S 83 and S 84. S 81 and S 82 are planned to receive it at a later major overhaul; Isaac Peral is not described as currently AIP-equipped.
Ships & variants
Hulls listed: 4 · In service: 1 · On order: 0
| Name | Pennant | Operator | Builder | Laid down | Launched | Commissioned / delivered | Status | Batch / variant |
|---|---|---|---|---|---|---|---|---|
| Isaac Peral | S 81 | Spain | Navantia, Cartagena | — | — | 30 November 2023 (delivery / commissioning ceremony at Cartagena) | In service | Lead boat. AIP not yet fitted (planned at a later overhaul). |
| Narciso Monturiol | S 82 | Spain | Navantia, Cartagena | — | October 2025 (launch / putting afloat, as reported 16 November 2026) | Delivery scheduled 10 December 2026; had not taken place as of 18 November 2026 | In trials | Not yet in service. AIP planned at a later overhaul. |
| Cosme García | S 83 | Spain | Navantia, Cartagena | — | — | — | Under construction | Planned with AIP from build. Later delivery (reporting has mentioned around 2028). |
| Mateo García de los Reyes | S 84 | Spain | Navantia, Cartagena | — | — | — | Under construction | Planned with AIP from build. |
Programme / unit cost: —