Harry DeWolf class
Country: CanadaManufacturer: Halifax Shipyards
Harry DeWolf -class offshore patrol vessels are warships of the Royal Canadian Navy (RCN) built within the Government of Canada Arctic and Offshore Patrol Ship (AOPS) procurement project, part of the National Shipbuilding Strategy. In July 2007 the federal government announced plans for acquiring six to eight icebreaking warships for the RCN.
Data-only class record added 21 November 2026 (Batch 12 raw-data expansion). One page per class; individual ships appear only in Ships & variants. Illustration pending. Text adapted from Wikipedia (CC BY-SA 4.0).

Community
Identity6 fields
- Designation
- Harry DeWolf class
- Manufacturer
- Halifax Shipyards
- Country
- Canada
- Category
- Offshore patrol vessel
- Role
- Arctic/offshore patrol vessel
Production & service5 fields
- Introduced
- 2021
- Service entry
- 2021–present
- Status
- In service
- Units produced
- Built: 2016–present / Completed: 6 / Planned: 8 (6 for RCN and 2 for CCG) / Active: 6 / Building: 2 (for CCG)
- Operators
- Royal Canadian Navy; Canadian Coast Guard (planned)
Specifications11 fields
- Full-load displacement
- 6,615 t
- Crew
- 65
- Length
- 103.6 m
- Beam
- 19 m
- Draught
- 5.7 m
Data trust
- Reliability
- Partially verified
- Sources
- Harry DeWolf-class offshore patrol vesselWikipedia · Accessed
- Last reviewed
- Confidence level
- Partial. Class figures transcribed from the cited Wikipedia article (infobox and ship list) on 21 November 2026; not independently audited.
Historical profile
The vessels are modelled on the Norwegian Coast Guard NoCGV Svalbard and as of 2007 were projected to cost CA$ 3.5 billion to construct with a total project procurement budgeted to cost $4.3 billion in order to cover maintenance over the 25-year lifespan of the vessels. In 2018 it was reported that the cost of the first six ships had increased by $810 million over previous projections. In 2023 it was reported that the cost for the first six ships had increased by a further $780 million and that of the two envisaged vessels for the Coast Guard by an additional $100 million. The lead ship of the class was announced as Harry DeWolf in September 2014, and four additional ships were named in 2015. Construction of the ships Harry DeWolf and Margaret Brooke started at the Halifax Shipyards in September 2015 and September 2016, respectively. Harry DeWolf and Margaret Brooke were originally planned to be delivered in 2019 and 2020 respectively.
Ships & variants
Hulls listed: 8 · In service: 6 · On order: 0
| Name | Pennant | Operator | Builder | Laid down | Launched | Commissioned / delivered | Status | Batch / variant |
|---|---|---|---|---|---|---|---|---|
| Harry DeWolf | AOPV 430 | — | — | 11 March 2016 | 15 September 2018 | 26 June 2021 | In serviceShip in active service | — |
| Margaret Brooke | AOPV 431 | — | — | 29 May 2017 | 10 November 2019 | 28 October 2022 | In serviceShip in active service | — |
| Max Bernays | AOPV 432 | — | — | 5 December 2018 | 23 October 2021 | 3 May 2024 | In serviceShip in active service | — |
| William Hall | AOPV 433 | — | — | 17 February 2021 | 27 November 2022 | 16 May 2024 | In serviceShip in active service | — |
| Frédérick Rolette | AOPV 434 | — | — | 29 June 2022 | 9 December 2023 | 13 June 2025 | In serviceShip in active service | — |
| Robert Hampton Gray | AOPV 435 | — | — | 21 August 2023 | 9 December 2024 | 16 November 2026 | In serviceShip in active service | — |
| Donjek | — | — | — | 31 July 2024 | 28 April 2026 | Projected 2026 | In trialsSea trials | — |
| Sermilik | — | — | — | 6 November 2025 | — | Projected 2027 | Under constructionUnder construction | — |
Programme / unit cost: —
Variants
Related systems
ARSENALIS // Research desk
Dossier resources
Loading map…
Natural Earth · schematic bordersNo operator entries recorded for this selection.
No structured operator list recorded. Country of origin is not treated as an operator.



