Amphibious assault shipAustralia2014In service

The Canberra class is a ship class of two landing helicopter dock (LHD) ships built for the Royal Australian Navy (RAN). Planning to upgrade the navy's amphibious fleet began in 2000, based on Australian experiences leading the International Force for East Timor peacekeeping operation.

Data-only class record added 21 November 2026 (Batch 12 raw-data expansion). One page per class; individual ships appear only in Ships & variants. Illustration pending. Text adapted from Wikipedia (CC BY-SA 4.0).

Amphibious assault ship // ID — canberra-class
Australia · Navantia, Ferrol, Spain and BAE Systems Australia, Victoria
Image pending

Community

Loading…

Identity6 fields

Designation
Canberra class
Country
Australia
Category
Amphibious assault ship
Role
Landing helicopter dock

Production & service5 fields

Introduced
2014
Service entry
2014–present
Status
In service
Units produced
Built: 2009–2015 / Completed: 2 / Planned: 2 / Active: 2
Operators
Royal Australian Navy

Specifications11 fields

Full-load displacement
27,500 t
Crew
358
Length
230.82 m
Beam
32 m
Draught
7.08 m

Data trust

Reliability
Partially verified
Sources
Last reviewed
Confidence level
Partial. Class figures transcribed from the cited Wikipedia article (infobox and ship list) on 21 November 2026; not independently audited.
Sources and methodology

Historical profile

With a new climate for growing Australian Navy spending, a desire existed for forward defence capability for landing and supporting troops on Asian territory, that had never existed in Australian history, even with the old Majestic -class light fleet carriers, HMAS Melbourne and HMAS Sydney in the 1970s. In 2004, French company Direction des Constructions Navales (DCN) and Spanish company Navantia were invited to tender proposals, with DCN offering the Mistral -class amphibious assault ship and Navantia proposing the " Buque de Proyección Estratégica " design (later commissioned as Juan Carlos I). The Spanish design was selected in 2007, with Navantia responsible for construction of the ships from the keel to the flight deck, and BAE Systems Australia handling the fabrication of the combat and communications systems. Finally, Siemens (Germany) supplied and fitted the azimuth thrusters. Construction of the first ship, HMAS Canberra, commenced in late 2008, with the hull launched in early 2011, and sea trials in early 2014. Canberra was commissioned in November 2014.

Ships & variants

Hulls listed: 2 · In service: 2 · On order: 0

NamePennantOperatorBuilderLaid downLaunchedCommissioned / deliveredStatusBatch / variant
CanberraL02—Navantia, Ferrol (Construction); BAE Systems Australia, Williamstown Dockyard …23 September 200917 February 201128 November 2014In serviceActive—
AdelaideL01—Navantia, Ferrol (Construction); BAE Systems Australia, Williamstown Dockyard …18 February 20114 July 20124 December 2015In serviceActive—

Programme / unit cost: —

← Back to naval systems

ARSENALIS // Research desk

Dossier resources

0 operator entries

No operator entries recorded for this selection.

No structured operator list recorded. Country of origin is not treated as an operator.

Community

Loading…

Recent reviews

    Sources & image credits →