Alexandrit class
Country: RussiaManufacturer: Sredne-Nevsky Shipyard
The Alexandrit class, Russian designation Project 12700 Aleksandrit (for the mineral alexandrite), is the newest class of Russian minesweepers designed by Almaz and being built by the Sredne-Nevsky Shipyard for the Russian Navy. The first ship was laid down on 22 September 2011 and was launched in June 2014.
Data-only class record added 21 November 2026 (Batch 12 raw-data expansion). One page per class; individual ships appear only in Ships & variants. Illustration pending. Text adapted from Wikipedia (CC BY-SA 4.0).

Community
Identity6 fields
- Designation
- Alexandrit class
- Manufacturer
- Sredne-Nevsky Shipyard
- Country
- Russia
- Category
- Minehunter
- Role
- Minesweeper
Production & service5 fields
- Introduced
- 2016
- Service entry
- 2016–present
- Status
- In service
- Units produced
- Built: 2011–present / Completed: 11 / Planned: 40 / Active: 11 / Building: 5
- Operators
- Russian Navy
Specifications10 fields
- Full-load displacement
- 620 t
- Crew
- 45
- Length
- 61 m
- Beam
- 10.2 m
- Draught
- 2.68 m
Data trust
- Reliability
- Partially verified
- Sources
- Alexandrit-class minesweeperWikipedia · Accessed
- Last reviewed
- Confidence level
- Partial. Class figures transcribed from the cited Wikipedia article (infobox and ship list) on 21 November 2026; not independently audited.
Historical profile
Anywhere between 30 and 50+ ships have been described as envisaged.
Ships & variants
Hulls listed: 16 · In service: 11 · On order: 0
| Name | Pennant | Operator | Builder | Laid down | Launched | Commissioned / delivered | Status | Batch / variant |
|---|---|---|---|---|---|---|---|---|
| Aleksandr Obukhov | — | — | — | 22 September 2011 | 27 June 2014 | 9 December 2016 | In serviceActive | — |
| Georgiy Kurbatov | — | — | — | 24 April 2015 | 30 September 2020 | 20 August 2021 | In serviceActive | — |
| Ivan Antonov | — | — | — | 25 January 2017 | 25 April 2018 | 26 January 2019 | In serviceActive | — |
| Vladimir Yemelyanov | — | — | — | 20 April 2017 | 30 May 2019 | 28 December 2019 | In serviceActive | — |
| Yakov Balyaev | — | — | — | 26 December 2017 | 29 January 2020 | 26 December 2020 | In serviceActive | — |
| Pyotr Ilyichev | — | — | — | 25 July 2018 | 28 April 2021 | 16 November 2022 | In serviceActive | — |
| Anatoly Shlemov | — | — | — | 12 July 2019 | 26 November 2021 | 29 December 2022 | In serviceActive | — |
| Lev Chernavin | — | — | — | 24 July 2020 | 14 April 2023 | 25 December 2023 | In serviceActive | — |
| Afanasy Ivannikov | — | — | — | 9 September 2021 | 9 August 2024 | 7 May 2025 | In serviceActive | — |
| Polyarny | — | — | — | 12 June 2022 | 24 April 2025 | 30 April 2026 | In serviceActive | — |
| Dmitry Lysov | — | — | — | 19 June 2023 | 5 December 2025 | 18 November 2026 | In serviceActive | — |
| Semyon Agafonov | — | — | — | 18 January 2024 | 30 September 2026 | — | Under constructionFitting out | — |
| Viktor Korner | — | — | — | 16 July 2024 | — | — | Under constructionUnder construction | — |
| Sergey Preminin | — | — | — | 16 May 2025 | — | — | Under constructionUnder construction | — |
| Leonid Balyakin | — | — | — | 29 August 2025 | — | — | Under constructionUnder construction | — |
| Dmitry Glukhov | — | — | — | 24 April 2026 | — | — | Under constructionUnder construction | — |
Programme / unit cost: —
Variants
Related systems
ARSENALIS // Research desk
Dossier resources
Loading map…
Natural Earth · schematic bordersNo operator entries recorded for this selection.
No structured operator list recorded. Country of origin is not treated as an operator.



