Akula class
Country: Soviet UnionManufacturer: Komsomolsk-on-Amur; Severodvinsk
The Akula class, Soviet designation Project 971 Shchuka-B is a series of fourth generation nuclear-powered attack submarines (SSNs) first deployed by the Soviet Navy in 1986. There are four sub-classes or flights of Shchuka-B, consisting of the original seven Project 971 boats (codenamed Akula I), commissioned between 1984 and 1990; six Project 971Is (Improved Akula s), commissioned between 1991 and 2009; one Project 971U (Akula II), commissioned in 1995; and one Project 971M (Akula III), commissioned in 2001.
Data-only class record added 21 November 2026 (Batch 12 raw-data expansion). One page per class; individual ships appear only in Ships & variants. Illustration pending. Text adapted from Wikipedia (CC BY-SA 4.0).

Community
Identity6 fields
- Designation
- Akula class
- Manufacturer
- Komsomolsk-on-Amur; Severodvinsk
- Country
- Soviet Union / Russia
- Category
- Nuclear attack submarine
- Role
- Nuclear attack submarine
Production & service5 fields
- Introduced
- 1984
- Service entry
- 1984–present
- Status
- In service
- Units produced
- Built: 1983–1999 / Completed: 15 / Planned: 20 / Active: 4 (4 active +6 on modernization in Russia) / Retired: 5 in total.
- Operators
- Soviet Navy; Russian Navy; Indian Navy
Specifications11 fields
- Submerged displacement
- 8,140 t
- Crew
- 73
- Length
- 110.3 m
- Beam
- 15.4 m
- Draught
- 9.7 m
Data trust
- Reliability
- Partially verified
- Sources
- Akula-class submarineWikipedia · Accessed
- Last reviewed
- Confidence level
- Partial. Class figures transcribed from the cited Wikipedia article (infobox and ship list) on 21 November 2026; not independently audited.
Historical profile
The Russians call all of the submarines Shchuka-B, regardless of modifications. Some confusion may exist as the name Akula was used by the Soviets for a different class of submarines, the Project 941, which is known in the West as the Typhoon class. The Project 971 was named Shchuka-B by the Soviets but given the designation Akula by the West after the name of the lead ship, K-284. According to defense analyst Norman Polmar, the launch of the first submarine in 1985, "shook everyone [in the West] up", as Western intelligence agencies had not expected the Soviet Union to produce such a boat for another ten years.
Ships & variants
Hulls listed: 18 · In service: 4 · On order: 0
| Name | Pennant | Operator | Builder | Laid down | Launched | Commissioned / delivered | Status | Batch / variant |
|---|---|---|---|---|---|---|---|---|
| Akula | — | — | Amur Shipyard | 11 November 1983 | 27 June 1984 | 30 December 1984 | DecommissionedDecommissioned in 2001. | — |
| Ak Bars | — | — | Sevmash | 22 February 1985 | 16 April 1988 | 29 December 1988 | DecommissionedDecommissioned in 2002, scrapping began in 2010 but the hull section was used in the construction of ballistic missile submarine Vladimir … | — |
| Barnaul | — | — | Amur Shipyard | 9 May 1985 | 28 May 1986 | 30 December 1987 | DecommissionedDecommissioned in 2011 | — |
| Kashalot | — | — | Amur Shipyard | 5 September 1986 | 18 July 1987 | 30 December 1988 | DecommissionedDecommissioned on 9 October 2019. | — |
| Pantera | — | — | Sevmash | 6 November 1986 | 21 May 1990 | 27 December 1990 | In serviceActive, overhaul and modernization completed in 2007. | — |
| Volk | — | — | Sevmash | 14 November 1987 | 11 June 1991 | 29 December 1991 | —Overhaul and modernization to finish in 2028. | — |
| Bratsk | — | — | Amur Shipyard | 23 February 1988 | 14 April 1989 | 29 December 1989 | DecommissionedDecommissioned 2022, awaiting scrapping. | — |
| Leopard | — | — | Sevmash | 26 October 1988 | 28 June 1992 | 30 December 1992 | In trialsOn sea trials as of 2026 following refit and upgrade | — |
| Tigr | — | — | Sevmash | 10 September 1989 | 26 June 1993 | 29 December 1993 | —Overhaul to finish in 2022. | — |
| Magadan | — | — | Amur Shipyard | 28 December 1989 | 23 June 1990 | 23 December 1990 | —In overhaul from July 2019 to 2022. | — |
| Vepr | — | — | Sevmash | 13 July 1990 | 10 December 1994 | 25 November 1995 | In serviceActive, overhaul and modernization completed in 2020. | — |
| Kuzbass | — | — | Amur Shipyard | 28 July 1991 | 18 May 1992 | 31 December 1992 | In serviceActive, overhaul and modernization completed in 2015. | — |
| Gepard | — | — | Sevmash | 23 September 1991 | 17 September 1999 | 5 December 2001 | In serviceActive, overhaul and modernization completed in 2015. | — |
| Kuguar | — | — | Sevmash | 18 August 1992 | — | — | —Not completed, the hull section was used in the construction of the Yury Dolgorukiy SSBN. | — |
| Rys | — | — | Sevmash | 31 August 1993 | — | — | —Not completed, the hull section was used in the construction of the Alexander Nevsky SSBN. | — |
| Samara | — | — | Amur Shipyard | 7 November 1993 | 5 August 1994 | 17 July 1995 | —Modernization to finish in 2023. | — |
| Nerpa; (ex- Chakra) | — | — | Amur Shipyard | 1993 | 26 July 2006 | 28 December 2009 | DecommissionedActive, has been leased to India from 2012 until 2022, returned already in 2021. Proposed to decommission in 2023. | — |
| Iribis | — | — | Amur Shipyard | 1994 | — | — | —Construction halted at 42% in 1996, may be completed and leased to India. | — |
Programme / unit cost: —
Variants
Related systems
ARSENALIS // Research desk
Dossier resources
Loading map…
Natural Earth · schematic bordersNo operator entries recorded for this selection.
No structured operator list recorded. Country of origin is not treated as an operator.



