Sikorsky CH-148 Cyclone

Country: United StatesManufacturer: Sikorsky Aircraft

Transport helicopterUnited States2018In service

The Sikorsky CH-148 Cyclone is a twin-engine, multi-role shipborne helicopter developed by the Sikorsky Aircraft Corporation for the Canadian Armed Forces. A military variant of the Sikorsky S-92, the CH-148 is designed for shipboard operations and replaced the CH-124 Sea King, which was in Canadian Armed Forces operation from 1963 to 2018.

Add to collectionCompare

Data-only record added 21 November 2026 (Batch 12 raw-data expansion). Illustration pending. Text adapted from Wikipedia (CC BY-SA 4.0).

Transport helicopter // ID — sikorsky-ch-148-cyclone
United States · Sikorsky Aircraft
Image pending

Community

Loading…

Identity5 fields

Designation
Sikorsky CH-148 Cyclone
Manufacturer
Sikorsky Aircraft
Country
United States
Category
Transport helicopter
Figures refer to
—

Production & service4 fields

Introduced
2018
Status
In service
Units produced
—
Service milestones
15 November 2008 (first flight) – July 2018 (introduced)

Specifications11 fields

MTOW
13,290 kg
Crew
4
Armament
—
Sensors
—
Engines
2 × General Electric CT7-8A7 turboshaft engines, 3,000 shp (2,200 kW) each

Supplied specifications16 fields

Role
Maritime helicopter
Manufacturer
Sikorsky Aircraft
Primary users
Royal Canadian Air Force
Number built
28
Developed from
Sikorsky S-92

Data trust

Reliability
Partially verified
Sources
Last reviewed
Confidence level
Partial. Figures transcribed from the cited Wikipedia article (infobox and specifications section) on 21 November 2026; not independently audited.
Sources and methodology

Historical profile

The Cyclone entered operational service with the Royal Canadian Air Force (RCAF) in 2018 and now conducts anti-submarine warfare (ASW), surveillance, and search and rescue missions from Royal Canadian Navy frigates. The helicopter also performs utility and transport roles in support of national and international security efforts. In 2004, Canada awarded Sikorsky Aircraft a contract for 28 CH-148s with deliveries originally planned to start in 2009. Deliveries were repeatedly delayed due to development issues and difficulty fulfilling contract requirements; the first deliveries, involving six initial helicopters (designated as Block 1), occurred during June 2015. Three years later, the Cyclone Block 2 achieved initial operating capability (IOC). The fleet was briefly grounded in early 2020 following a crash that was attributed to poor documentation and software flaws.

← Back to air systems

ARSENALIS // Research desk

Dossier resources

0 operator entries

No operator entries recorded for this selection.

No structured operator list recorded. Country of origin is not treated as an operator.

Community

Loading…

Recent reviews

    Sources & image credits →